Model and stakeholder consultation
  • ⠀⠀
  • About
  • Categories
    • Renewable Energy
    • Energy Efficiency
    • Pollution Prevention and Control
    • Environmentally Sustainable Management of Living Natural Resources and Land Use
    • Terrestrial and Aquatic Biodiversity Conservation
    • Clean Transportation
    • Climate Change Adaptation
    • Sustainable Water and Wastewater Management
    • Eco-efficient and/or Circular Economy Adapted Products, Production Technologies and Processes
    • Green Buildings
    • *Green Construction Management Approach
  • Case Studies
  • How to use
  • Support
  • 中文
SIGN IN
MyLogin
Register
  • You are here:  
  • Home
  • 4/WSD/16 - Improvement of Water Supply to Sheung Shui and Fanling

  • 4/WSD/16 -上水及粉嶺區供水改善工程

  • 704 - 730 King’s Road Office Development

  • Commercial Redevelopment at 704 – 730 King’s Road

  • District Cooling System (DCS) at Kai Tak Development (KTD)

  • Happy Valley Underground Stormwater Storage Scheme

  • Hong Kong-Zhuhai-Macao Bridge Substation (HMB)

  • Integrated Contract of PRH at Anderson Road Site A & B Phases 1 & 2

  • Landslip Prevention and Mitigation Programme

  • Main Contract Works for the Proposed Development at Tung Chung Town Lot No. 2 & 11

  • Ocean Park Tai Shue Wan Water World Project Contract No. TSW – C006

  • One Taikoo Place

  • One Taikoo Place

  • Redevelopment of Ma Tau Wai

  • Site Formation and Infrastructure Works for Development of Anderson Road Quarry Site

  • Widening of Fanling Highway - Tai Hang to Wo Hop Shek Interchange

  • 啟德發展區區域供冷系統

  • 太古坊一座

  • 太古坊一座

  • 安達臣道地盤A及地盤B第1和第2期公屋發展計劃綜合合約

Page 1 of 2

    • Start
    • Prev
  • 1
  • 2
    • Next
    • End
Contact Us
38/F, COS Centre,
56 Tsun Yip Street,
Kwun Tong, Kowloon,
Hong Kong
(+852) 2100 9000
e&[email protected]
General

Sustainable Construction

About the Model

Categories

Case Studies

How to Use

Support

  •