Anderson Road Site A & B consists of a commercial podium and 9 residential blocks with total 7,209 residential units.
Sustainable construction achievements:
- Integrated Procurement Approach (IPA) adopts a three-envelope tendering system that considers an additional factor on innovation for design and construction.
- IPA enables earlier and better integration of design and construction expertise from different fields to achieve flexibility, better value, higher quality and improved productivity.
- IPA enables the team to generate many sustainable construction ideas like 5D-BIM, Structural Soil, Zero Irrigation System, Waste Materials Up-cycling and Scaffoldless Lift Installation.
- BEAM Plus Platinum
- 3-star of China Green Building Design Label
Hong Kong Housing Authority’s vision
Provisions in Anderson Road Site A & B